Drill Bits and Dynamite....Part Twenty Four

This mostly a video post. I just dug these few clips up recently from the 2006-2008 years of the Sea to Sky Highway project.
You will see in the beginning, several trim shots at Cut 14. These are gentle little shots to get the pioneering road in...and not destroy the power-lines and fiber-optic across the road. The excavator is there to control the blast mats when the shot goes off. The shot is designed so that the machine is not in any jeopardy.
The highway is closed by traffic control people, but we only have a few minutes to get the shot done, clean the debris, and then re-open the road.
On some days we have 5 minutes total. Some days are 10 to 20 minutes, depending on the time of day, day of the week, night/day and various holidays.
There are blog posts that feature more detail on the whole Cut 14 adventure. There are also posts that detail the work on Cut 5, and show how close it is to the ferry terminal below.
Cut 14...photos and stuff
 http://adventuresinmikeslife.blogspot.ca/2011/12/drill-bits-and-dynamite-part-sevenmore.html
Cut 14 slide
 http://adventuresinmikeslife.blogspot.ca/2011/11/superbowl-sundayhelicopters-and.html
Cut 5
 http://adventuresinmikeslife.blogspot.ca/2012/01/drill-bits-and-dynamitepart-fifteensea.html
FAST FORWARD AT APPROX 2 MIN...UP TO APPROX 10:30
Click on the "Youtube" logo to get a bigger screen 